SCHEDULING PROBLEMS FOR JOBS AND DIFFERENT MACHINES WITH MAKE SPAN CRITERION AND LEFT TIME ALIGNMENT

Authors

  • Daniel Rezmires S.C. SIRCA S.A, Piatra Neamt
  • Alfredo Monfardini RIMA Spa, Italy
  • Cezar Racocea "Gheorghe Asachi" Technical University of Iasi

Keywords:

scheduling, make span, left time alignment, Gantt, CIM, FMS

Abstract

This paper focuses on operations scheduling, which involves assigning jobs to workstations or employees to jobs for specified time period. The scheduling techniques we discuss in this paper are similar with Gantt method type and serv various process types in manufacturing process. There are companies which have to deliver many types of different products in a specified time, as, for example, a slewing ring factory, which has to sell a large variety of products (taking into account dimensions and configurations), in the same time.

Downloads

Published

2014-09-11

Issue

Section

Articles

How to Cite

SCHEDULING PROBLEMS FOR JOBS AND DIFFERENT MACHINES WITH MAKE SPAN CRITERION AND LEFT TIME ALIGNMENT. (2014). Mechanical Testing and Diagnosis, 4(3), 13-20. https://ojs.ugal.ro/index.php/mtd/article/view/2384

Most read articles by the same author(s)