Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing
DOI :
https://doi.org/10.35219/mms.2023.2.04Mots-clés :
3D printing, Fused Deposition Modeling, water drilling installation, FH 150Résumé
The washing head is the most important sub-assembly in a water well drilling installation, and ensures the operation of the installation on the principle of "hydraulic rotary drilling with direct circulation of drilling fluid", whereby, inside the rotating drill rod assembly is injected, through the washhead, drilling fluid from the discharge of the drilling mud pump, which is fed from a pit (pit) dug below ground level.
Téléchargements
Les données relatives au téléchargement ne sont pas encore disponibles.
Téléchargements
Publiée
2023-06-15
Numéro
Rubrique
Articles
Comment citer
1.
Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing. Ann_UGAL_MMS [Internet]. 15 juin 2023 [cité 2 nov. 2026];46(2):23-7. Disponible sur: https://ojs.ugal.ro/index.php/mms/article/view/6121