Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing

Auteur/ices

  • Sorin Alexandru FICĂ IPCUP Ploiesti, Romania
  • Andrei DIMITRESCU Politehnica University from Bucharest, Romania
  • Claudiu BABIȘ Politehnica University from Bucharest, Romania

DOI :

https://doi.org/10.35219/mms.2023.2.04

Mots-clés :

3D printing, Fused Deposition Modeling, water drilling installation, FH 150

Résumé

The washing head is the most important sub-assembly in a water well drilling installation, and ensures the operation of the installation on the principle of "hydraulic rotary drilling with direct circulation of drilling fluid", whereby, inside the rotating drill rod assembly is injected, through the washhead, drilling fluid from the discharge of the drilling mud pump, which is fed from a pit (pit) dug below ground level.

Creative Commons License

Téléchargements

Les données relatives au téléchargement ne sont pas encore disponibles.

Téléchargements

Publiée

2023-06-15

Numéro

Rubrique

Articles

Comment citer

1.
Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing. Ann_UGAL_MMS [Internet]. 15 juin 2023 [cité 2 nov. 2026];46(2):23-7. Disponible sur: https://ojs.ugal.ro/index.php/mms/article/view/6121

Articles les plus lus par le ou les mêmes auteur/ices