Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing
DOI:
https://doi.org/10.35219/mms.2023.2.04Schlagwörter:
3D printing, Fused Deposition Modeling, water drilling installation, FH 150Abstract
The washing head is the most important sub-assembly in a water well drilling installation, and ensures the operation of the installation on the principle of "hydraulic rotary drilling with direct circulation of drilling fluid", whereby, inside the rotating drill rod assembly is injected, through the washhead, drilling fluid from the discharge of the drilling mud pump, which is fed from a pit (pit) dug below ground level.
Downloads
Download-Daten sind nocht nicht verfügbar.
Downloads
Veröffentlicht
2023-06-15
Ausgabe
Rubrik
Articles
Zitationsvorschlag
1.
Construction of the FH 150 Hydro-Geological Drilling Facility with Additive Manufactured Markers Through 3D Printing. Ann_UGAL_MMS [Internet]. 15. Juni 2023 [zitiert 2. November 2026];46(2):23-7. Verfügbar unter: https://ojs.ugal.ro/index.php/mms/article/view/6121
