Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship

Auteur/ices

  • Dragoș Damianov Vard Shipyard Romania Tulcea
  • Carmen Gasparotti “Dunarea de Jos” University of Galati

DOI :

https://doi.org/10.35219/AnnUgalShipBuilding/2024.47.03

Mots-clés :

Earned Value Management, project performance, ACWP, BCWP, BCWS.

Résumé

The development of projects in the naval field is of crucial importance for the industry. Their success depends on how their costs and duration are managed. The study aims to present how naval projects can be monitored using Earned Value Management (EVM), a technique used to evaluate their performance from the point of view of costs. The Earned Value analysis has been applied to the manufacture and installation of a ballast system on a cargo ship. The results obtained have demonstrated that savings are achieved, and the works are delayed compared to the plan.

Téléchargements

Les données relatives au téléchargement ne sont pas encore disponibles.

Téléchargements

Publiée

2024-12-04

Numéro

Rubrique

Articles

Comment citer

1.
Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship. Ann.UDJG.ShipBuilding [Internet]. 4 déc. 2024 [cité 2 nov. 2026];47:25-32. Disponible sur: https://ojs.ugal.ro/index.php/fanship/article/view/7050

Articles les plus lus par le ou les mêmes auteur/ices

<< < 1 2