Metallic offshore platforms – production chronology and future solutions

Auteur/ices

  • Aurel – Dan Maimon “Dunarea de Jos” University of Galati

DOI :

https://doi.org/10.35219/AnnUGalShipBuilding.2018.41.09

Mots-clés :

offshore platforme, jack-up, assembling, loading, installation.

Résumé

The article, after a short historic setting and an attempt to definitions and classifications, will be articulated around three chapters following the chronology of the realization (studies, manufacturing, installation) of the metallic offshore platforms and will end on a fast review of the solutions of the future. The demand for energy continues to rise asking for inexpensive energy solutions. A large mettalic structure used to house workforce and machinery (offshore platform) extract, process and ship or pipe the oil and natural gas to the hore, can be fixed to the ocean bottom, depending on the circumstances, or could be an island or can float.

88x31.png

Téléchargements

Les données relatives au téléchargement ne sont pas encore disponibles.

Téléchargements

Publiée

2018-12-28

Numéro

Rubrique

Articles

Comment citer

1.
Metallic offshore platforms – production chronology and future solutions. Ann.UDJG.ShipBuilding [Internet]. 28 déc. 2018 [cité 2 nov. 2026];41:63-72. Disponible sur: https://ojs.ugal.ro/index.php/fanship/article/view/1009

Articles les plus lus par le ou les mêmes auteur/ices