Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship

Authors

  • Dragoș Damianov Vard Shipyard Romania Tulcea
  • Carmen Gasparotti “Dunarea de Jos” University of Galati

DOI:

https://doi.org/10.35219/AnnUgalShipBuilding/2024.47.03

Keywords:

Earned Value Management, project performance, ACWP, BCWP, BCWS.

Abstract

The development of projects in the naval field is of crucial importance for the industry. Their success depends on how their costs and duration are managed. The study aims to present how naval projects can be monitored using Earned Value Management (EVM), a technique used to evaluate their performance from the point of view of costs. The Earned Value analysis has been applied to the manufacture and installation of a ballast system on a cargo ship. The results obtained have demonstrated that savings are achieved, and the works are delayed compared to the plan.

Downloads

Download data is not yet available.

Downloads

Published

2024-12-04

Issue

Section

Articles

How to Cite

1.
Earned value management used to monitor the project costs of ballast system fabrication and installation on a cargo ship. Ann.UDJG.ShipBuilding [Internet]. 2024 Dec. 4 [cited 2026 Nov. 2];47:25-32. Available from: https://ojs.ugal.ro/index.php/fanship/article/view/7050