Metallic offshore platforms – production chronology and future solutions

Authors

  • Aurel – Dan Maimon “Dunarea de Jos” University of Galati

DOI:

https://doi.org/10.35219/AnnUGalShipBuilding.2018.41.09

Keywords:

offshore platforme, jack-up, assembling, loading, installation.

Abstract

The article, after a short historic setting and an attempt to definitions and classifications, will be articulated around three chapters following the chronology of the realization (studies, manufacturing, installation) of the metallic offshore platforms and will end on a fast review of the solutions of the future. The demand for energy continues to rise asking for inexpensive energy solutions. A large mettalic structure used to house workforce and machinery (offshore platform) extract, process and ship or pipe the oil and natural gas to the hore, can be fixed to the ocean bottom, depending on the circumstances, or could be an island or can float.

88x31.png

Downloads

Download data is not yet available.

Downloads

Published

2018-12-28

Issue

Section

Articles

How to Cite

1.
Metallic offshore platforms – production chronology and future solutions. Ann.UDJG.ShipBuilding [Internet]. 2018 Dec. 28 [cited 2026 Nov. 2];41:63-72. Available from: https://ojs.ugal.ro/index.php/fanship/article/view/1009

Most read articles by the same author(s)